About the Project

Our project is a total of 1990 m2 fruit processing and cold storage warehouse and when we include the area where 260 m2 more truck loads are loaded, it will have a construction part of 2250 m2.

In the project, a total of 9 units of 110 m2 (550 m3) cold storage, 1 rapid cooling 80 m2 (400 m3), 1 shock room 80 m2 (400 m3) and 1 fruit processing area 417 m2 and 3-storey administrative building (65 m2 floor).